AA+I News & Insights
Design thinking, process notes, and market insights from the AA+I team.

A builder who underbids by a wide margin has to recover it somewhere, usually through change orders or corners that surface years later.
U.S. construction loses about $177 billion a year to labor spent on avoidable problems, and 48% of all rework traces to poor project information and miscommunication.
The National Research Council treats change orders from architect and engineer errors of up to 5% of construction cost as normal. On a $2M home that is $100,000 of surprises, and a complete drawing set exists to beat that yardstick.

Drawings are half the job, and making sure the building matches them is the other half. An attorney who defends architects explains why construction administration is the wrong place to cut costs.

Planning a custom home? Learn the critical factors, including industry cost-loss stats and mistake allowances, to protect your building investment today.

Learn how to compare architecture proposals by looking beyond fees. Discover why document quality is the most critical factor in controlling project costs.

Wind-resistant design lowers Florida insurance premiums and protects the house, but only the features documented in the drawings earn credit at inspection.

I had no capital to advertise. Nobody was going to find me. If those people hadn't known what I was doing, there wouldn't have been a firm.

Buying land for a custom home? Avoid costly mistakes by checking flood zones, wetlands, and soil conditions before you close on your Florida property.

The liability sat with me and the control didn't. That is a genuinely uncomfortable place to sit, and it doesn't get more comfortable with time.

I am never going to be the uber-communicator who answers a client text at one in the morning. But I can find someone who is.

It's entirely possible to end up with more revenue and a worse margin than you had before, doing more work under more pressure and feeling less profitable, because you are.

People don't build their dream home three or four times. Most of them haven't done it once. The value of a trusted adviser is concentrated entirely in the one shot you get.
Translate